Plot 6 – almost there

image

image

image

Plot 6 is almost finished.  The woodwork needs painting and the walls need making good but the finish line is in sight (for the inside at least, the outside is going to be a mud bath for a while longer.

Categories: Plot 6, Second fix | Leave a comment

Plot 6 kitchen and bathrooms going in

image

image

Categories: Plot 6, Second fix | Leave a comment

No more ladders needed in Plot 7 :-)

IMG_20141015_164330

IMG_20141015_165450

Categories: Uncategorized | Leave a comment

Plot 7: The last of the scaffolding comes down!

IMG_20141011_135158-1

PANO_20141011_160345-Edit

Categories: Uncategorized | Leave a comment

Plot 6 – flooring goes down

image
image

Categories: Plot 6, Second fix | Leave a comment

Plot 7 finally starts to get internal walls!

IMG_20141002_162144 IMG_20141002_162151

Categories: Uncategorized | Leave a comment